Kako odpraviti pogoste napake merilnika TRG pločevinke Dalian TEIKOKU?
Načelo TRG merilnika črpalke v pločevinkah:

One coil is buried above and below the stator coil of the shielded pump (which can be understood as the top and bottom of a horizontally placed cylinder), and the two coils are connected, but the phases are opposite, such as "the center line of the rotor" and "the geometric center line of the two coils {{0}} pump If the center line of the bearing is coincident, then the upper and lower coils induce voltages of equal magnitude but opposite phases, which cancel each other out, and the current is 0, which means that the TRG meter is at 0, which is the lowest point of the green zone. When the bearing is worn, the rotor center line At this time, the induced currents of the upper and lower coils are not equal in magnitude. After a certain treatment, the current is generated, and the TRG pointer also changes with the magnitude of the current. However, such as in the green area, the rotor offset caused by the bearing wear is acceptable. , the rotating rotor will not wear the shielding sleeve and can continue to run, but when the pointer is in the yellow zone, it means that the wear is increasing, and the bearing must be repaired and replaced. After the red zone, it indicates that the rotor has worn the shielding sleeve, and it must be disassembled at this time. Check whether the shielding sleeve is in good condition. If it is worn, please return it to the factory for repair. The watch plays a very important role in the daily maintenance of the shielded pump.
Iz zgornjega je razvidno, da merilnik TRG zazna le radialno obrabo ležaja, saj se po radialni obrabi lahko središčna črta rotorja zamakne, odmika osi rotorja pa ta merilnik ne more zaznati, če pa je aksialni zamik je prevelik, bo povzročil določeno črpalko. Obraba mesta bo povzročila previsok tok. Če obstaja tokovna zaščitna naprava, se bo sprožila, vendar ne bo poškodovala črpalke. Na splošno je to mogoče rešiti z zamenjavo potisne plošče in ležaja.
Če povzamemo: merilnik TRG in ampermeter sta okna za potrditev, ali črpalka v pločevinkah deluje dobro.
TRG navodila
št. | Indikacija TRG in stanje električne črpalke | Možna točka napake | Preverjanje ali metoda zdravljenja |
1 | The hands of the watch gradually increase, the pointer does not swing, and sometimes the operation is not good | The power supply voltage increases or the bearing wear increases. | First check whether the terminal voltage is normal, and then check the bearing wear. If it exceeds the value, replace the bearing with a new one. |
2 | The needle swings irregularly, the flow and pressure of the electric pump are unstable, the internal sound is abnormal, and sometimes the end is heated | The circulating fluid system is abnormal, the flow is insufficient or there is air | Check the circulating fluid pipeline and check whether the type of electric pump meets the process requirements |
3 | The hands suddenly rise to the red zone, and the swing of the hands increases and fluctuates regularly. Sometimes restart after shutdown, the fault disappears | The expansion of the rotor cage bars causes local breakage | Replace with a new rotor of the same model |
4 | The needle suddenly rises to the red area, the swing of the needle increases and there are regular.fluctuations accompanied by abnormal sound inside the pump | The impeller shakes, the rotating shaft is bent, and the mouth ring is worn | Disassemble the electric pump casing to check and repair the damage |
5 | The needle is greater than 0.75, the operation sound is not smooth, and the flow and pressure are low | Zaporedje faz je obrnjeno | Check power phase sequence and reconnect power |
6 | The needle is normal, the operation is not smooth, the flow pressure is low or the operation is normal, and the needle is greater than 0.75 | The three-phase power supply of the module does not match the phase sequence of the motor terminals. TRG and thermal element circuit are reversed | Check the phase sequence of the three-phase power supply of the module and the lead wires of the motor terminals and connect them in the correct phase sequence |
7 | The needle is normal, the operation is not smooth, the flow pressure is low or the operation is normal The needle is greater than 0.75 | The three-phase power supply of the module does not match the phase sequence of the motor terminals. TRG and thermal element circuit are reversed | Check the phase sequence of the three-phase power supply of the module and the lead wires of the motor terminals and connect them in the correct phase sequence |
8 | When the needle is greater than 0.5, the current of one phase is zero | izven faze | Check the power cord and connect the power |
9 | The hands of the watch are suddenly large and small or swing, this phenomenon is temporary | The pipeline is mixed with foreign matter, or the working fluid has crystals or precipitates | Check the working fluid and circulation pipeline, and discharge foreign matter |
10 | The electric pump works normally, the positive and reverse connection of the power cord is always greater than 0.75, and sometimes the fault disappears after stopping for one stage and then restarting | The module or TRG meter is damaged or the TRG system loop is grounded | Check the input and output electrical parameters of the module, check the grounding points of the modules, circuit boards and electrical circuits |
11 | roke ne kažejo ali obračajo | The polarity is reversed when the module is reassembled after inspection. The instrument is damaged and the module is selected incorrectly | Check the selection type of the instrument and the module, whether the module mounting hole and the polarity of the instrument conform to |
12 | Miza se ne premika v določenem položaju | Pin kartice | Odstranite merilnik, da preverite |
13 | The main circuit terminal has zero insulation to ground, or trips when starting the electric pump | The wiring frame is damaged, the module is damaged, and the main winding is damaged. TRG and thermal element circuit are reversed | Remove the module and main winding from the wiring frame and check separately |
Proizvodna aplikacija
The company's main business scope includes: central air-conditioning maintenance, cleaning and technical services; cooling tower and fan coil cleaning and maintenance services; custom processing of lithium bromide solution; sales of lithium bromide solution special impurity separators; central air-conditioning host and various zero Sales of accessories; installation and sales of central air conditioning systems, etc.
Široko se uporablja v večjih klimatskih{0}}sistemih ter hladilnih in toplotnih virih procesnega hlajenja; v jeklarskih, tekstilnih, kemičnih, elektronskih, farmacevtskih, živilskih in drugih industrijskih in rudarskih podjetjih, pa tudi v hotelih, gledališčih, bolnišnicah in velikih poslovnih zgradbah, se pogosto uporabljajo centralne toplotne postaje in druge priložnosti.